Construction Update November 4

Construction Update – November 4

Construction Update November 4The winter weather that has moved in this month has not stopped this construction crew. Here are all the new updates they were able to achieve this month:

  • Concrete for the 4th floor has been poured for phase 3.
  • The steel “super structure” has been finalized
  • Terrace common area and plaza have been framed and windows have been installed in Phase 1.
  • The Drywall is 75% complete for Phase 1.
  • Progress continues on the siding work and exterior trim.
  • Phase 2 exterior walls have been framed
  • Pools shells are under construction
  • The mechanical room and boiler flue are almost complete
  • The stairway from the ski area to the pool courtyard has been installed
  • The stair structure for the lobby is in place

The construction at Grand Colorado on Peak 8 is still underway. We are excited to share this luxury resort with you, your family and friends. Make sure to like us on Facebook for the most recent updates and news!

https://www.facebook.com/GrandColorado/